@Vikodank@WhitecloaksO@luigimorel_@ScrublandSlick The answer to that is themocouples work well over a wide temperature range, while semiconductor based sensors have a far more limited range. So the hot junction sits in your high temperature process, while the cold junction, reference sensor and amplifier sit somehere cooler.
@Vikodank@WhitecloaksO@luigimorel_@ScrublandSlick To get an actual temperature measurement, we nees to combine this with some other type of temperature sensor.
So why use thermocouoles? why not just use the other tempeature sensor directly?
@Gracie_Blue89@sophiemeaden You can't really "maintain" burried pipes, especially small diameter ones. So you are generally limited to reactive repairs and/or mass replace,nt of pipes deemed to be life expired.
@Stocklington@cjsnowdon The re-brand was not "pointless".
Selling of part of your buisiness and allowing the buyer to keep using your brand inceeases the risk that any bad PR the buyer generates will fallnon you.
@76Stax@SkyNews Why do you think the name change had anything to do with saving the shops?
The name was changed because whsmith wantes to keep the name for the part of the buisiness they were retaining.
@LeftieStats No they did not buy whsmith, they bought whsmith's struggling high street buisiness.
The profitable part of the buisiness still trades under the name whsmith.
@think_in_points And there are two countries that are in the EU but not in schemgen.
The republic of cyprus is in theory "legally obligated to join" but can't do so until/unless the trnc situation os resolved.
And the republic of ireland which has an "opt-out" and an open border with the uk.
@ItsWelford@DeptfordWife1 Prior to ETA dual citizens who did not require a visa could enter on a foreign passport.
But unless they lie on the application they can't get an ETA, and so can't travel to the UK by air or sea unless they get a UK pasaport or a very expensive "cerificate of entitlement"
@FitzoliverJ@Milo_Edwards There is no regulatory requirement of have a "deisel at the back" though it's often done for practical reasons.
If there is a diesel at the back it is techically possible to "propell" the train with it but there are a bunch of restrictions around doing so.
@Graemereaper@virginmedia Selling off the emails seems like a desperation move to me, it will raise cash in the short term, but it will alsomlikely accelerate their decline.
@Graemereaper@virginmedia but in the last few years between the rise of altnets and openreach's expansion of ther fttp services the number of places where they are the only >100mbps option is declining.
@Clinnick1@jruddy99@Worldchampsx2 I would assume the map is defining "metro" as a system that is not part of the mainline railway and has no street running sections.
@dahankzter@LH@omarvvvr Yes and simd register sizeon x86 has gone from 64-bit register size (mmx) to 128 bit (sse/sse2/avx) to 256 bit (avx2) to 512 bit (avx512).
But simd registers are usually sperate from the main integer registers.
@0xMises@norskelynet@sysxplore Then we got the current scheme, driven by the enterprise vendors. It works very nicely on enterprise hardware and means you can generally do like for like replacements or system imaging without breaking anything.
But it's not always so good for non enterprise systems.
@0xMises@norskelynet@sysxplore But this scheme was problematic.
1. it required reconfiguration after hardware replacement or system imaging.
2. It was stateful, which was difficult for stuff trying to be read only.
3. The "original" and "renamed" names overlapped, which made the renaming fragile.